Export packing

Caoyuhe prepares galvanized frame parts, connectors, covering materials, ventilation components, and accessories according to the project scope. Parts can be bundled and labeled so local crews can identify them more easily on site.

Container loading and freight

Destination port information should be provided by the buyer. The loading plan depends on greenhouse size, pipe length, covering material, and accessory scope. For many standard material packages, preparation is commonly 7-10 days after project details are confirmed.

Buyers who need a schedule view can also review the greenhouse lead time from China to USA guide to align production, ocean transit, customs, and local installation timing before ordering.

Documents you receive

Project documents can include a material list, packing list, greenhouse layout drawings, installation drawings, and component labels. These help buyers confirm what is included before shipment and during installation.

U.S. buyers comparing export-ready suppliers can also read the greenhouse shipping from China to USA guide for a quote-focused checklist covering container planning, drawings, packing labels, and installation handoff.

Installation support

Caoyuhe mainly supports installation through drawings, assembly notes, and direct communication. Buyers usually arrange local crews to install the greenhouse structure, covering, doors, ventilation, and optional systems.

Ask about shipping and installation